Overview

NORTH EAST BICH DONG PROJECT VIET YEN BAC GIANG

The most anticipated project at the end of the year in the center of Viet Yen district. Opportunity to get ahead and catch the investment wave after the covid 19 pandemic. Invest in the right location, at the right time to catch the opportunity of Viet Yen coming to town.
INVESTOR: Tuan Quynh Construction and Commercial Services Joint Stock Company.

Location

Located in the heart of Bich Dong town; Viet Yen district – BG.

Ground

– Total area: 15.3 hectares
– Adjacent: 511 lots with area from 75m2 – 155m2.
– Villa: 35 lots, area from 180m2-286m2.

Utilities

  • The project is located on Provincial Road 284, near the district center (planning to go to town in 2025), 1km from the lake and Bich Dong square, near public administrative areas – 500m radius.
  • Right next to Than Nhan Trung secondary school, Viet Yen high school, the project road connects directly to Nong Lam University
    100m from the district general hospital (expanding to 5 hectares), 500m from the town center market, right near the agricultural bank.
  • Near large industrial parks Dinh Tram, Van Trung, Quang Chau, Song Khe – Noi Hoang: from 2.5km – 6km. 1.5km from the planning of Trung Son – Tu Lan industrial cluster.
  • From the project, it is only 4km to the Hanoi – Bac Giang expressway, very convenient for traveling between provinces.
    11km from the center of Bac Giang City, 11km from Bac Ninh City
    INTERNAL FACILITIES
  • Roads in the urban area are from 14m to 26m wide
  • Adjacent area from 75m2 to 155m2 (511 lots); Villa 180m2-286m2 (35 lots)
  • Fully equipped: school, park, lake, 50ha natural lake cluster, cultural house, parking lot, commercial center.

Photo realistic

PDF

Không có tệp PDF nào.